Steel Global Net
Login
register
Add Business Info
Hotline:0769-88683756
Steel experts information
Home
Purchase
Sale
Company
News
Product
Expo
Forum
My Business
中文版
Enter keyword
Supply and demand information
Supply Information
Product information
Enterprise Records
Project cooperation
It industry
Acting Information
Service information
*
benefit of registration?
*
how to find the buyer?
Industry News
Price Quotes
Domestic exchange
International exchan
Engineering Legend
Institute of Technol
Policies and regulat
Quality assessment
Industry Standard
Expo
Your current position:
Home
>
News
>
Industry Standard
Enter keyword
Supply and demand information
Supply Information
Product information
Enterprise Records
Project cooperation
It industry
Acting Information
Service information
*
benefit of registration?
*
how to find the buyer?
Industry Standard
Steel grid structure installation of the quality m
Release time:
2008-2-28 12:01:12
frequency:
209
Steel grid structure installation of the quality management
1, based on criteria:
"Construction quality inspection standards" GB50300-2001
"Steel Construction quality inspection norms" GB50205-2001
2, the construction preparations for the
2.1 Materials
2.1.1 steel grid connection and the installation of steel materials, high strength bolts, welding, wire, flux, and so on, should be consistent with the design requirements, and should be pre-certification.
2.1.2 steel grid with the installation of hollow ball welding, welding stiffened ball, the ball bolts, semi-finished products of small assembling units, bar, and semi-finished products such as rubber bearing, and should meet the design requirements and the corresponding national standards.
2.2 Main machines:
Welder and oxygen - the acetylene cutting equipment, wheel sawing, cutting lathe bar, bar cutting power head, steel tape, foot plate, caliper, Level, theodolite, ultrasonic flaw detectors, magnetic detector, upgrade equipment, lifting equipment , hammer, wire brush, hydraulic jack, and tools such as chain inverted.
2.3 operating conditions:
2.3.1 before installation should grid bearing axis line with the elevation of a post-mortem examination. Grid axis, elevation position must comply with design requirements and the relevant standards.
2.3.2 capitals before installation to check the strength of the concrete, concrete strength capitals must comply with design requirements and the relevant standards in force in the country after the provisions can be installed.
Information sources:
Releaser:
The web of gjg88.com
【
Check up comments
】(Have
0
comments Count)
Related
Commentary
UserName:
PassWord:
Content:
Latest Demand
·
[Demand]
das
·
[Demand]
End-tank
·
[Demand]
Composite plate
·
[Demand]
Production Line
·
[Demand]
Production Line
·
[Demand]
Pipe and accessori..
·
[Demand]
Lighting board
·
[Demand]
Sandwich watts
·
[Demand]
Sandwich watts
·
Latest Supply Info
·
[Supply]
1231
·
[Supply]
End-tank
·
[Supply]
Composite plate
·
[Supply]
Roof\edge\flume
·
[Supply]
Pipe and accessorie
·
[Supply]
Sandwich Plate
·
[Supply]
Lighting board
·
[Supply]
Lighting board
·
[Supply]
Sandwich watts
·
[Supply]
Sandwich watts
suggestions and comments
Title:
Content:
E_mail: