Steel Global Net
Login
register
Add Business Info
Hotline:0769-88683756
Steel experts information
Home
Purchase
Sale
Company
News
Product
Expo
Forum
My Business
中文版
Enter keyword
Supply and demand information
Supply Information
Product information
Enterprise Records
Project cooperation
It industry
Acting Information
Service information
*
benefit of registration?
*
how to find the buyer?
Industry News
Price Quotes
Domestic exchange
International exchan
Engineering Legend
Institute of Technol
Policies and regulat
Quality assessment
Industry Standard
Expo
Your current position:
Home
>
News
>
Domestic exchange
Enter keyword
Supply and demand information
Supply Information
Product information
Enterprise Records
Project cooperation
It industry
Acting Information
Service information
*
benefit of registration?
*
how to find the buyer?
Domestic exchange
Create excellent project a corporate image
Release time:
2008-2-28 11:15:11
frequency:
212
Tianjin Petrochemical 1 million tons / year of ethylene and related projects 60,000 tons / year Sulfur Recovery Unit works in the April 10, 2007 start of construction, it is the first set of large projects start the construction of production facilities, is a project of a landmark project. Hoi Shing companies undertaking to the device after the civil engineering tasks, as its 2007 "No. 1 Project", and in accordance with the "fine work" strict management standards, and carefully build to ensure the surrender of a Tianjin company a satisfactory answer .
This is the first time in Hoi Shing Tianjin Petrochemical Company undertaking the largest civil engineering tasks production equipment, to ensure that first win, the company sent Hoi Shing has been fought courageously from the beginning, the Project Department dares to fight tough battles担this task. According to the unified arrangements of Tianjin Petrochemical, the company Hoi Shing Construction main tasks include: a 100 m high reinforced concrete structures chimneys, a 3807? O two-story reinforced concrete frame structure molding machine plant, a 2955? The bent-O Steel roof structure of the plant and bag device for the entire district electricity use full-function, 1278? O framework distribution of a two-story, and the entire installation within the region stack-road projects. Expected to bear the entire project, high standards, heavy tasks, the construction complex and changeable conditions, it is necessary to the successful completion of this task very difficult. Project to the Ministry of pressure as a driving force, do not have to create conditions in the April 8, 2007 to officially entered the construction site grooving construction.
As sulphur refining unit of the district is located in the device, the scene narrow construction site, security conditions complicated, and the region for the removal of asphalt, underground obstacles many do not possess the temporary road construction. First of all active projects for the Department of owners, and supervision to the programme, in the shortest possible time, the scene will be closed to all mining board the two main temporary road repair RCC, foreshadowing good stone to smooth passage out of vehicle mechanics, construction for a few All power cables 100 metres high erected in accordance with the regulations, temporary pipes laid underground, the variety of materials placed in an orderly manner, the five licensing a complete map signage smart, organized, construction workers wear uniforms, carry required safety protection products, the entire site formed a civilized, orderly and inspiring the fiery scene.
Because it is early start construction, all construction conditions at the same time not have to bring a lot of unexpected problems, the Department of the project to overcome many difficulties, organize more than 200 construction workers Pixingdairu day and night. Construction constantly moving forward, the difficulties to come. Bent bags for the concrete column, section size in design changes, the original steel insufficient number, to be done with the original foundation is removed? Or adopt other methods? Based on the actual project at the scene to take the new techniques for the design, control and the owners agreed that the use of new materials of planting bar and processing, ensures that quality, and shorten the construction period and saving costs of the project also. At the same time the Department of the project in accordance with the reunification of the whole scene scheduling, will be part of the effective and rational construction scheduling, greatly reducing the labor costs. In the 100 meters chimney construction, as is the ultra-high building, security very difficult task, requiring many times a day sometimes weeks, to bring great difficulty in construction.
HSE management of production safety is the lifeline of the whole project. The project to implement the Department of HSE management system documents as an opportunity to combine features of the project, and standardize management, the safety of Sinopec Group 10 ban, Tianjin Petrochemical production safety regulation of the two "power lines", all the time bound by every one in the construction and management of the safety of the personnel. Molding machine plant to the roof slab is 24 m double T-long large-scale reinforced concrete prefabricated elements, each of dozens weight tons, to be accurate to 10 metres high in place the framework of the beam. To ensure the safety of transportation, hoisting place, a number of discussions of the project, the preparation of hoisting programme, after passing the examination by the parties, using 200 tons of tire-lifting cranes, hoisting a place.
According to the "good faith, demand first" business philosophy, the project strictly according to the Ministry of Construction programme and the implementation of standards, quality shape to target small strict management, organization and implementation. Construction of the process of implementation of the programme and the corresponding strict standards of procedure, and in accordance with the characteristics of projects set up quality control, focus on the quality of our prominent appearance, and implementing the "three-location" system, do a good transfer of customs procedures do not fail miss, finished good protection measures are implemented, strengthen the control of information, and strive to achieve progress and synchronization to ensure that the quality of information entities and qualified by Division, made the progress of the projects timely completion of the analysis and summary of the above through Secure a qualified acceptance rate of over 90%.
Summer heat, and all construction personnel in the open construction site more than 380 C high temperature operations, installation of steel structures, the construction of the concrete laying sweat soaked clothes officers, all staff一声no complaints, no crying hard, only one thought, make concerted efforts, Time to complete the project on time for the company disappointing Hoi Shing, a major project for the effort. Hard work pays off, the owner and the strong support of the Commissioner, with the assistance of the company from top to bottom Ningchengyigumin Hoi Shing, the recently installed in the smooth implementation of the TAC and truly Hoi Shing companies in the construction of large projects with a high starting开门红. Mr Cheung
Information Source: Published by: Global Network Steel
Information sources:
Releaser:
The web of gjg88.com
【
Check up comments
】(Have
0
comments Count)
Related
Commentary
UserName:
PassWord:
Content:
Latest Demand
·
[Demand]
das
·
[Demand]
End-tank
·
[Demand]
Composite plate
·
[Demand]
Production Line
·
[Demand]
Production Line
·
[Demand]
Pipe and accessori..
·
[Demand]
Lighting board
·
[Demand]
Sandwich watts
·
[Demand]
Sandwich watts
·
Latest Supply Info
·
[Supply]
1231
·
[Supply]
End-tank
·
[Supply]
Composite plate
·
[Supply]
Roof\edge\flume
·
[Supply]
Pipe and accessorie
·
[Supply]
Sandwich Plate
·
[Supply]
Lighting board
·
[Supply]
Lighting board
·
[Supply]
Sandwich watts
·
[Supply]
Sandwich watts
suggestions and comments
Title:
Content:
E_mail: